Upstream

muster deck

Project Overview
  • GIS Abbeville fabricated the Mad Dog Muster Deck and Transportation Frame along with assembly of Nor Safe Davits and winches.

  • Installation of winches to davits and routing of winch cables.

  • Load testing of Davit Arms, Assisting MMR with electrical installation.

  • Weighting of Deck and load-out.