Deck & bridge structure

Project Overview
  • Jacket, Deck and Bridge Structure
  • 4,500 St Jacket (392’ WD)
  • 4,500 St Deck
  • 12 Man Living Quarters
  • New Fuel Gas Line: 4” diameter by 7 miles’ long
  • Subsea Tie-in of 24” Appomattox line and new 4” fuel gas line using divers.
  • Brownfield Scope on existing SP89E
  • Complete Deck Modifications for S – Spools
  • HUC Scope (October 2018 / January 2019)
  • Installation of closure spools from top of jacket and bottom of topsides.
  • Spools Include: 20” Appomattox Riser, 4” Fuel Gas Line, Seawater Caisson, Firewater Caisson, Firewater Overboard Line, and Seawater Overboard Line
  • Vent Boom / CO2 snuffing closure spools
  • Sump Pump and relevant ICP Connections
  • Endymion and Proteus Pipeline connections from bridge to SP89E-B
  • Electrical, Instruments, and Tubing Connections
  • Installation aids removal
service lines
  • Offshore / Onshore Construction
  • Project Management
  • Mods
  • Fabrication