Power Generation

utility grade solar project

Project Overview
  • First 2 utility grade solar projects to be constructed in placed into operation in the state of LA 
  • 102 MW of solar power generation
  • ~270 thousand solar panels installed on 730 acres

Scope of Work
  •  ~6.5 million feet of distribution cable
  • 215,000 feet of High voltage
  • 265 High Voltage Terminations
  • 36 Power Conversion Stations
  • 130,000 of fiber optic cable
  • 215 fiber optic splices
Service Lines
Service Line PDF's